Old 17 January 2010, 09:45 PM
  #11  
HI SOOB
Scooby Regular
 
HI SOOB's Avatar
 
Join Date: Jan 2003
Location: Perthshire
Posts: 1,190
Likes: 0
Received 0 Likes on 0 Posts
Default

The area will be hard standing and ready to put down the sand and lay the blocks on as I am doing the majority of the pre work as I am extending the drive etc etc, so as I say, just arrive start straight away. I was hoping it would be 30-35 a sq meter. If not I will do it myself for 20 a meter plus my time.