Originally Posted by
HI SOOB
The area will be hard standing and ready to put down the sand and lay the blocks on as I am doing the majority of the pre work as I am extending the drive etc etc, so as I say, just arrive start straight away. I was hoping it would be 30-35 a sq meter. If not I will do it myself for 20 a meter plus my time.
You should be able to do it cheaper than that, because of the amount of discount we get its around £50 per 10m2 of 50mm blocks or £50 per 8m2 for 80mm ones. I would say 2 guys with nothing to do apart from screed sand and lay blocks £1k-£2k depending on the cost of your blocks.
HTH
Aaron